Feasibility Study
  • Estimate package size ( Accuracy : ~ 90%)
    • - Basic Rule : Design rule / Process Rule / Ball Count
  • Pre-Simulation (1) : Tj_max estimation, SI Design Constraint Review, Power/Ground Planning
Initial Package Design (Specification Determination)
  • Fix ball map & bump map , Define package size & Package Design( Accuracy : ~ 99%)
  • Pre-Simulation (2) : Power/Ground Planning, Delay Estimation, Thermal Simulation (Macro-Model)
Package Design (Development Stage)
  • Finalize package design for manufacturing
  • Post-Simulation : SI/PI simulation for Verification, Detail Thermal Simulation